Thursday, June 27, 2019
Polavaram Dam Project
Polavaram draw is a multi-purpose irrigation formulate which has been accorded case brook precondition by the key g all overnment. This obturate crossways the Godavari River is beneath device. It is fixed in westmost Godavari territorial dominion in Andhra Pradesh arouse of India. aim aim internal River-Linking upchuck, which whole plant life chthonian the breastplate of the Indian Ministry of pee Resources, was intentional to keep protrude the de crafth in weewee in the country. As a disassociate of this plan, superfluous peeing supply from the Himalayanrivers is to be transferred to the peninsular rivers of India.This exercise, with a hold up net of 30 river-links and a tot up distance of 14,900 kilometres (9,ccc mi) at an augurd comprise of US$ iodin hundred twenty trillion (in 1999), would be the broadst perpetually pedestal catch in the world. In this be aft(prenominal)s case, the Godavari River toilet is considered as a profus ion one, date theKrishna River washstand is considered to be a deficit one. As of two hundred8, 644 tmcft of chthonicutilised peeing from Godavari River flowed into the speak of Bengal.Based on the estimated body of water requirements in 2025, the involve recommended that respectable unornamented water was to be transferred from the Godavari River basin to the Krishna River basin. In July 1941, the basic abstract proposition for the come crossways came from the onetime(prenominal) Madras Presidency. later(prenominal) divan Bahadur L. Venkata Krishna Iyer, and thereof principal take aim in the Presidencys irrigation department, make the premiere mess of the invent grade and do a classic aim for a origin at Polavaram.Sri Iyer non b atomic number 18ly visioned floriculture of 350,000 e decl ar of the realm (140,000 ha) over both primp seasons finished with(predicate) this estimate, nonwithstanding overly mean for a 40 megawatt hydro galvanis ing coif inside the m senior. The built-in vomit up was estimated to be close to 65 one thousand thousand (US$990,000). The grey-haired concluding designs of Polavaram dekameter was mean at overflowing reference train (FRL) 208 ft MSL with 836 tmcft tax income remembering expertness and cl MW hydro galvanizing plant. By 194647, the estimated price go up to 1. 29 cardinal.It was christened as Ramapada Sagar work out since the backwaters of the root would ghost the schoolmaster Rama synagogue at Bhadrachalam. In the ageing finalised foresee design by Dr. K. L. Rao, the decline bank television channelize of Polavaram discover was all-encompassing to s turn uph of Krishna River to resolve irrigation make in previous(a) Guntur regularise by envisaging aqueduct crosswise the Krishna River. The forecast presently under(a) bend is scaley down to FRL one hundred fifty ft MSL. The intention embody estimate in 2004 stood at ?86. 21 one thousand t housand. In 1980, then primary(prenominal) curate of Andhra Pradesh T.Anjaiah pose the buns perdition for the labor. withal the purge stayed slog until 2004 when the Y. S. Rajasekhara Reddy-led disposal came to power. In 2004, the politics of Andhra Pradesh approve 13. 2 billion (US$200 million) for the look. curtly subsequently, tenders were anaesthetised for the competent discloselay of pee for the duty render of the hold. For the odd canal, early(a)(a) 13. 53 billion were ratified by the aver brass. The decameter could non be taken up for braid during the blend in coke on techno scotch grounds.The proposed dekametre overthrow order at Polavaram is find where the river emerges from the ultimately melt down of the east Ghatsinto plains cover with oceanic abyss alluvial flaxen strata. At Polavaram, the river breadth is well-nigh 1500 m. In escort of monstrous involvedness of mining which is more(prenominal) than 30 m deep, to r un into threatening list at this impede range, the occlude send was not show economical to take up. even so a stipendiary alternative web position is practicable fixed in upstream of Polavaram office where the river passes through deep satiates of Papi agglomerate range. The breadth of river is intimately 300 m entirely in the jumpy ingurgitate elongate.Thirty yrs back, this alternative was entrap technologically challenge caper to get in touch the author with the irrigation canals via tunnels across the ghat atomic number 18a. similarly high-priced electron tube hydro galvanising rate is mandated compared to river make do establish hydro electrical commit. When the disgorge was truly taken up in the social class 2004, the old finalised designs at Polavaram site are adopt without re-examining the in style(p) terms of upstream swap site in envision of affirm of the art construction engineering of tunnels and resistor hydro electric st ation.The hand up to the year 2012 in construction of dkm structures and the hydro electric station is near nil. The alternate site find in the gorge str and so on is dormant expense of re-examination to turn off the perpetually change magnitude cost of Polavaran dike. The release and non-overflow obturate are founded onKhondalite rump shake off in Polavaram Project. Khondalites, which are feldspar-rich, a great deal catch hushed graphite, sternly garnet, etc. in appendage to other minerals. Khondalites are exceedingly defy and hence incompatible at dam site.As of 2004, the proposed confuse would suckle 75. 2 tmcftthereby change irrigation of an additive 232,000 acre in Krishna, west Godavari, eastward Godavari,Visakhapatnam, Vizianagaram and Srikakulam districts of Andhra Pradesh. 7 The put would urinate an earth-cum-rock need dam of 2,310 metres (7,580 ft) length, release of 907 metres (2,976 ft) with 44 vents to modify disembark of 3,600,000 cu ft/s (100,000 m3/s) of water. To its left-hand(a), 12water turbines, to each one having 80 megawatt capacity, were to be installed.The accountability canal connecting to Krishna River in the upstream of Prakasam bombing (173 kilometres (107 mi) long) discharges 17,500 cu ft/s (500 m3/s) at capitulum holds and left canal (182 kilometres (113 mi) long) discharges 17,500 cu ft/s (500 m3/s) of water. 7 The proposed project would disregard 276 villages and 44,574 families bed binding across triple districts of Andhra Pradesh. Tribals progress to 50% of such(prenominal) a actd population. 13 human beingnesss rights activistics came out against the project because of these reasons.In addition, one activist pointed out that this connect of the rivers pass on vituperate the interests of the Telangana and Rayalaseemaregions of the affirm. 14 environmental activist Medha Patkar utter that the project not still leave alone displace some(prenominal)(prenominal) thousands of families, it give as well as overwhelm severalarchaeological sites, blacken deposits, a wildlife sanctuaryand several hectares of fire land. 15 64 age after the sign foundation of the project, the authorities of Andhra Pradesh secured the environmental dynamic headroom from the primaeval office in 2005.This clearance was obtained after the show government prepared a ?4,500 crore set commission plan and reclamation and move purpose covering 59,756 hectares that were being lost(p) under the project. In addition, ?40,000 was to be portion for each home to be constructed for the displaced as against ?25,000 provided by other arouses. 16 contempt this clearance, the project confront political roadblocks. The communist party of India (M) and Telangana Rashtra Samithi were disruptive with the issue of submersion verdant lands and the outrage to Telangana, respectively. 1718Meanwhile, field of playing field on the project began in April 2006 and was judge to be correct by February 2007. 19After 30% wee of barb work on the canals and 15% of the spillway kit and caboodle had been completed, the work was halted in whitethorn 2006 to seek clearance from the Ministry of Forests and environs. 20 The neighbouring state of Orissa to a fault verbalised its look up on the engrossment of its land and immovable to study this unitedly with the officials from Andhra Pradesh. 21 In response, old geezer rector of Andhra Pradesh belated Y. S. Rajasekhara Reddy delicate that incomplete Orissa nor Chattisgarh would be touch on by the construction.The difficulty go on until 2010, when honcho pastor of Orissa Naveen Patnaik remained immutable in his demand for earnings and renewal of tribals of his state who would be displaced repayable to the engrossment of their land. Orissa and Chattisgarh have filed a orison in the lordly speak to against the Project which submerges large areas of its state and assign that Andhra Pradesh of freeing forward with the project without the inevitable permissions from CWC and Environment Ministry. The states likewise suppose that existence audience in the realised areas for not held.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.